Bennelong St - Seaforth

DECK

Job Description

Replacement of all four decks. 

The Design was created following our clients hand sketched drawings. 

We were then able to execute exactly what they wanted.  

Process

  • Materials - Timber 90mm Merbau decking.

  • Construction of two decks at the front of the house consists of140mm Merbau handrail with 90x90 merbau posts and stainless steel wire.

1/30